X

Product Description

The NV25B7FE1T Vertical Pump is a compact and efficient multistage booster pump designed for high-demand industrial, commercial, and agricultural applications. Its vertical, in-line design saves space while providing exceptional reliability and performance.

Equipped with a 2 HP motor, the NV25B7FE1T delivers a flow rate of up to 25 GPM and can handle pressures up to 362 PSI. Constructed with durable 304 stainless steel components, this pump ensures corrosion resistance and long-lasting operation in a wide range of environments. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections make installation and servicing simple and efficient.

Certified to meet NSF/ANSI 61 and 372 standards, this pump is ideal for applications such as reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and irrigation.

###

###

###

Installation Manual

Installation Instructions for NV25B7FE1T Vertical Pump

  1. Preparation:
    • Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer.
    • Ensure the installation site is level, stable, and provides adequate ventilation for motor cooling and servicing.
    • Verify that the pump model matches the system specifications and intended application.
  2. Mounting the Pump:
    • Secure the pump base to a solid, flat surface to prevent vibrations during operation.
    • Align and support the suction and discharge piping to avoid excessive strain on the pump.
    • Install isolation valves on both the suction and discharge sides for easier maintenance and servicing.
  3. Piping Connections:
    • Ensure piping matches the pump’s 1.5" ANSI 150# flanged connections.
    • Install proper gaskets to prevent leaks, ensuring they do not obstruct flow.
    • Remove protective covers or caps from the flanges before installation.
    • For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
  4. Electrical Connection:
    • Have a certified electrician verify that the electrical supply matches the motor’s specifications (2 HP).
    • Ensure proper motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
    • If rotation is incorrect on a three-phase motor, reverse any two leads to correct it.
  5. Priming the Pump:
    • Remove the fill plug and use a funnel to fill the pump casing with water.
    • Open the vent plug to allow air to escape as the pump fills with water.
    • Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
  6. Initial Testing:
    • Open the suction valve fully and partially open the discharge valve.
    • Apply power to the motor and monitor for smooth operation without noise or vibration.
    • Gradually open the discharge valve to achieve desired operating conditions.
  7. Safety Precautions:
    • Never operate the pump without water to avoid damage to internal components.
    • Replace coupling guards after installation to prevent injuries.
    • Ensure the pump is properly grounded and all connections are secure before starting.

NV25B7FE1T

SKU: CQE-PM-89010
Looking for a container quantity? Get Villo PRO
$4,551.00 USD /piece
5OFFSALE (5% OFF)
Enter piece

This quantity requires 0 Piece(s).

Items adding...

Enhance your order with these recommended add-ons.

Certificates will be updated soon.
Carbon-neutral shipping on all orders
40065kg
shipping emissions removed
That's like...
102565
miles driven by an average gasoline-powered car
We fund innovations in...
Direct Air Capture
Bio Oil
Mineralization

You may also like

Recently viewed